Wednesday, February 8, 2012

Limping Along

22nd December, 2011 - steel bars for concrete columns of 1st floor up and ready

Just when I thought things were smoothly moving along, the holiday season descended upon us. Holidays are socially accepted and morally sanctioned times to overindulge, whether at play or at rest. A joy most of the time. But too much of a good thing is precisely that - too much. The 5 holidays over the past month and a half meant in this case, a loss of the ability to work normally. And so, since the 2011 Christmas holidays, work has been limping along, slowly and painfully. This is going to be a tough race to win.

28th December, 2011 - 1st floor columns casting complete

1st January, 2012 - Ground floor form-work supports removed, beginning form-work for 2nd floor beams and slab

4th January, 2012 - ready for casting

9th January, 2012 - 2nd floor slab completed

16th January, 2012 - 2nd floor columns ready for casting

19th January, 2012 - beginning form-work for flat roof

Hoping It Was Priscilla

20th December, 2011

sitting pretty in pink

Lip-synching stiletto-ed dancing-queens were - disappointingly - not what I encountered behind the flaming pink monster truck parked INSIDE my house on this particular site visit. Instead, was something a little more elegant albeit more austere: It was a jaw-droppingly gargantuan CRANE!

The pink cement truck and a crane parked behind. There was just about enough space for me to stand and pivot around.

Ewe Hong the contractor, was ecstatic that he managed to squeeze (barely!!) these 2 pieces of growling mega-machinery into the site. Because he could do this, the floor slabs of the 1st & 2nd floors and the roof-garden could now be poured more easily and quickly using the machines. But, this was only to be done for the back 1/3 of the building (until grid-line#6 on the plan).


Building of the middle section would continue laboriously without the help of heavy machinery after the roof of the back section is completed.

Grunting efficiently away, the pink cement truck spews its unctuous contents into the awaiting crucible

The crucible - filled with grade 35 concrete - is then precariously lifted over the roof-tops ...

... to elegantly arrive at its destination, where its precious cargo ultimately becomes an indiscernible part of a floor slab!


Monday, December 5, 2011

Inching Up

A couple of things I have learnt about what happens to a construction project at the end of the year is that 1) the monsoon rains limit the number of working hours if the work to be done is outdoors, and 2) sub-contractors are rushing to complete projects before year-end so they can collect payment and your project - because it only started not too long ago, or simply because you are just a small-fry - is left suspended. These 2 factors alone are enough to slow everything down to the point of a stand-still on some days.

The best time to get things done is during the 7th lunar month, it seems. Its when construction workers are the least busy because many Chinese are pantang and don't want to have projects during that period. Useful piece of info, especially if living in Penang. Knowledge is power.

Here is a pictorial update on the slow progress so far.

4th November: the 9th pile-cap completed and I'm off to KL

10th November: the remaining pile-caps in place, ground beams laid and the tractor clearing the site

24th November: The plumber has put this project on hold while he completes another project. But the sewage and drainage pipes have to be laid before the ground slab is poured. So work on the ground slab is suspended until the plumber returns. Meanwhile, the pillars at the back of the house has been erected.

1st December: Formwork for beams & slab of back portion of 1st floor being made.

2nd December: Making the cage for the concrete slab

Friday, November 4, 2011

Capping the 9th Pile - Monsoon Excitement!

unloading the pre-mixed concrete on to wheel-barrows

2nd November, 2011: The concrete delivery truck never arrives on time. The monsoon rains on the other hand, almost always do. So when the truck finally arrived at 4.15pm last Wednesday, the workers exploded into a frenzy, releasing the humid afternoon's accumulated anxieties and tensions as they raced against time to fill the pile-cap with wheel-barrow after wheel-barrow of concrete.

The pile was capped in 30 minutes, just in time before the first drops were felt. Hurrah!!

Quickly! Quickly! Racing to cap the piles before the rains arrived

Storm clouds gathering. Arrive it did. As expected.

Monday, October 31, 2011

Lightweight Bricks

An Autoclaved Aerated Conrete block or lightweight brick, is essentially concrete with lots of little air pockets. According to Wikipedia, AAC was invented in the mid-1920s by the Swedish architect and inventor Johan Axel Eriksson. But it only became a popular building material world-wide in the 1980's. To me, it looks like a rectangular block of hardened meringue.

The wall - notice the size of the normal brick sitting on top of the wall

The wall separating the house and the back-lane is being rebuilt using this material. The reason for using this "brick" over conventional clay bricks is the need to lighten the load on the site. Indeed, these blocks are light - scarily light. The wall swayed when I touched it while it was being built, but thankfully stiffened when the concrete columns were erected later, effectively bracing the ends of the wall.

AAC blocks will also be used for all the walls dividing the rooms. Because they have so much air in them, they are very effective thermal and sound insulators, perfect for hotel room walls.


Wednesday, October 26, 2011

Ground Beams

Laying of ground-beams are underway. As of today, the ground-beams for the kitchen/toilet area at the back of the house have been laid.

ground-beams for the toilets & kitchen area

Ground-beams function as connectors between pile-caps. (and pile-caps are concrete blocks that sit on top of the piles) In a site where the ground is soft, there is a high risk of uneven settlement amongst the pile-caps. So, what the ground-beams do is that they "tie" the caps together to stabilize the foundation and minimize uneven settling. The workers are currently laying the beams in the studio/gallery section
.

moulding for the ground-beam in the studio area, waiting to be filled with concrete

Look at how high the water-table level is - sitting just below the pile-caps. After a recent bout of monsoon rains, the water level rose up to about a foot and a half below floor level. You can gauge the water level from the ground-beam at the back section. It looked like this:-

after the rain

Tuesday, October 18, 2011

Bakau Rules the Day

the architect's vision

Originally, the 3-storey extension at the back of the house was to sit on a foundation of concrete piles. But we switched to using bakau piles after discovering there was only one piling contractor in all of Malaysia with equipment compact enough to enter the site. He was going to charge me over 3x the normal mobilisation cost, probably because he had a monopoly on the market. I wasn't about to spend the amount he wanted, which was almost a quarter of my budget. S
o, bakau piles it had to be.

bakau standing by

It turns out that bakau wood is an extremely suitable piling material for the soil conditions at Malay Street, and has been traditionally used in the area as a material for laying building foundations. As the area was reclaimed from what was originally a swamp, the water table is very high. This allowed the piles to be perpetually immersed in water - a pre-requisite condition for ensuring bakau - or mangrove - doesn't rot. Also, the 'soil', being composed of marine clay made it easy to drive the piles in using only a backhoe.

the backhoe, ready to go

I learned that bakau piles are called "friction piles" because the piles are suspended in the clay by friction between the pile and the surrounding clay - rather than resting on rock or a hard surface at the bottom. Its as if the clay were gripping the piles like a hand would.

bakau piles for one column, ready for capping

This would work out well. Except that the weight of the building had to be reduced. So, we scrapped the green roof and changed the concrete stairs at the back to one of steel.

pouring concrete to cap the pile

Monday, October 17, 2011

ReStarting - neutered and neurotic

Its been over 2 years since my last post. During this time I had been busy applying for planning and building permissions from the city council.

This was my first time ever having gone through such an extended bureaucratic process. And I was totally overwhelmed and floored by the reality of its own caricature. Its a long story, better told over bottles of wine. Suffice to say the process confirmed the long-held belief that the civil service is from another dimension where irrationality is a way of life, and any attempt to engage with them would suck you into a deep psychotic morass that is potentially inescapable. Inevitably, my experience reduced me to a ball of quivering jelly, incapable of anything except scream with popping blood-shot eyeballs "I WILL COMPLY!".

When the approval letter was finally issued in June, 2011, I didn't even dare to feel relief, fearing a second letter from another department to follow informing that I had left out something or other and therefore was not in compliance. Thankfully, it remained a nightmare.

Thursday, April 16, 2009

Penang design weekend

On the 5th of April, Lillian came to Penang for a day to look at no.105.

With her was Incognito Amigo – an engineer friend who has kindly offered to advise on structure related issues. They arrived in the morning at just the right time for breakfast. So, I took them for a leisurely Char Koay Teow in Pulau Tikus after which we made our way to no.105 where Teong Kooi and Joyce, teachers from my Free School days, joined us.

Teong Kooi, proud teacher that he is, offered to take responsibility for providing ambient music for 105, drawing from his vast collection of jazz records and cds. That morning he chatted excitedly, smoked, watched and listened as Joyce quietly read the newspapers.

Meanwhile, Incognito checked the beams, pulled the ceiling boards down nearly killing me, looked at some cracks and kicked the wall (and the bricks crumbled and fell out!), while Lillian took additional measurements and photographed the views from the building. Discussions centered around structural design and choice of materials. We also considered the relationships between the old and new parts of the house and the spatial transitions within the house.

2 sweaty hours later, we adjourned to Keng Kwee Street for cendol which was frantically delicious. This was followed by a much calmer experience at the E&O where we adjourned to for beer, coffee, and more discussion on the transition between the various spaces and elements in the house eg the air-well, pond, entry way and also the human traffic-flow.

Here at the E&O, Teong Kooi extolled the virtues of capitalist opportunism, without which, he said, he would most certainly be unable to enjoy the luxuries of such a hotel for the price of a cup of coffee, including taking a crap in style. We most certainly couldn’t disagree.

It had been an intense day of discussions, and for Lillian and Incognito, designing as well. Teong Kooi and Joyce suggested we rounded off the day with some grilled sea-food in Batu Maung. No one could top that suggestion. And so, despite driving into a freak storm and with Incognito and Teong Kooi ending up in Prai, we did eventually make it in time to catch the picture perfect sunset that sealed a very productive day.

KL Design week

This past month, I have met and discussed renovation plans with my architect and friend, Lillian Tay over 2 major sessions – one in KL and the other in Penang. This is office web-site http://www.veritas.com.my/

The 1st KL meeting was held in Lillian’s house on 22nd March, where 3 other friends and my sister, Heng Leng attended as well. It was a rowdy free-for-all that propelled itself late into the night on copious amounts of food, alcohol and cigarettes.
We talked about a range of issues: what the space will be used for; sustainability of the business; the cost of the renovation; what to retain, to restore or to demolish; being ‘green’; the possible structural solutions that can be used and what it means to be located in the heritage zone.

It was indeed a fabulous brain-storming session that Lillian would mine for design ideas which we looked at and discussed a few days later.

Mark Choo, resident accountant and risk manager who had been away checking on a chicken farm in Sitiawan, came along for the follow-up meeting on 25th March, where we “crunched some numbers” and gawked at Lillian’s design. She presented a simple and very elegant scheme for an 8 – 10 room budget hotel that included a multi-functional studio, a cafĂ© and maybe a small performance area.

The scheme opened up the house, allowing additional light and ventilation by reclaiming the pre-existing side air-well, and balancing small, compact rooms with lots of common access areas. While the front of the house will be restored, the back section after the air-well will be replaced with a freestanding, 3-storey concrete and steel intervention.

Excited as I was by her bold approach to the design process, I couldn’t help thinking, secretively, about some not-so-lofty things, like where I was going to keep my mop, how to get rid of the stink from the toilet bowl, where are the air-con compressors going to be stacked and stuff like that. But I wasn’t sure if I was “allowed” to, or whether the time was right to bring them up. So I kept quiet and thought I’d better wait a while and see what happens before asking these kinds of mundane questions.

Thursday, March 12, 2009

Striking gold!

Look! Look what my initial excavation has revealed

- the original granite airwell AND patterned cement tiles circa 1920 - 1940! All buried underneath a foot of construction rubble and concrete!

The entire floor had been raised previously in an attempt to prevent flood waters from entering the house and from this preliminary dig, it seems like at least some of the floor features are still in place. The tiles are a little caked with lime after being buried for so long, but that's a small matter. What matters is that the airwell is still there! Now, I hope and pray that the entire granite airwell at least, is still intact, but that will be another story for another time.

Accompanying the discovery of the existence of this airwell, was another big surprise - the realisation that the original position of the airwell was towards the centre of the house and not to the side, as it currently is. This was later confirmed by Dr Gwynn Jenkins (friend and cultural anthropologist) who very kindly sent me this interesting old plan from her collection. No. 105 is lot no.86 on the plan. This means that the corresponding space upwards all the way to the roof will now have to be reconfigured if I were to reclaim the original airwell.

And look at this. Look at the two little beams that cut across the other parallel beams in the picture below. This marks the original position of the staircase towards the back of the house rather than its current position at the side. The previous owner sure did some major reshuffling to create a warehouse-like space. Isn't this interesting?

For the past 3 days, I have been buzzing with excitement over these discoveries. I finally wound down yesterday evening, pleasantly walking around with Janet and getting caught in the rain. We passed the house occupied by some Indian old-timers - Janet's buddies, it seems. She chatted for a while and found out one of them has been hospitalized. He was a stevedore when he was young. They didn't drink much water working in the docks those days and his kidneys, after all these years, are suffering from the dehydration he must have endured back then. She'll visit him at the hospital.

And by the way, my aunt has been enjoying a winning streak at her mahjong sessions since that visit to the Tiger God. She's pleased.

Saturday, March 7, 2009

Rehabilitation

One of the greatest tragedies that has befallen some of the pre-war shophouses in Georgetown has been the use of non-porous materials in later repair-works.

Because the water table is very high in the inner city, walls and floors have always suffered from rising damp. In the past, the use of porous terracotta tiles for the floors and lime plaster on the walls, coupled with sufficient ventilation from an unobstructed air-well and back-yard, allowed the damp to evaporate through the floor and walls. Besides keeping rising damp uner control, the process of evaporation kept the house cool. It was intelligent design; one that was sensitive to climate, geography and the laws of nature.


Later efforts at renovating and repairing pre-war houses had prioritized the use of harder and less porous materials to keep rising damp at bay, chief of which are concrete and stoneware or cement tiles. Unfortunately, this did not solve the problem of rising damp. By locking the damp in the walls, it was forced to creep further and further up the walls, sometimes even rising up to the first floor, magnifying the problem. This, and the reclamation of extra space by covering up the airwell, and building up the back-yard have compounded the damage to the houses by greatly obstructing air-flow and reducing ventilation.

Over the years, these houses became very, very sick and was thus primed for termite attacks, rotting timber beams and water and salt-damaged walls. Sadly, 105 Malay Street is one of them.

Friday, March 6, 2009

The Tiger-god protects against all evil-doers!

And so, I finally was able to collect the keys to 105 Malay Street from my lawyer, which I did this past Monday. Its now ... *ahem*... my house. Of course, I went over immediately to look it over. It was a complete mess. There was a termite infested ceiling, termite infested floorboards, slabs of plaster peeling off the water-damaged walls, rotting beams, leaks everywhere, a broken staircase, rotting food and piles of discarded shoes. But I loved it and I was happy and excited.

The next day I set about looking for a contractor to clear out the trash and to hack and remove all the unwanted additions. After talking to 2 prospectives, I settled for Lim, a contractor my new friend, Bernard, had recommended. Lim had worked on restoring a house on Chow Thye Road that Bernard was managing for a couple of his friends. Bernard had been pleased with Lim's work and attitude, and gave a strong recommendation. So Lim it was. He started work on Wed.

Meanwhile, I had sauntered over to Komtar nearby in search of some renovation guidelines. I thought I'd better be clear about regulations since Malay Street separates the Georgetown heritage core zone from the buffer zone. (On one side of the street, the houses are in the core zone and on the other, the buffer zone. No.105 lies in the buffer zone.)

After being re-directed a couple of times in the maze that is Komtar, I found my way to the Heritage Building Control Section of the MPPP Building Department, on the 11th Floor, where I spoke to Mr Tan. Mr. Tan was a friendly chap who assured me that I was free to seek his assistance anytime to discuss my plans with him. But he didn't give me any guidelines. I was a bit perplexed. (I did however, find out that I would be allowed to build a 3rd storey from the air-well to the back of the house. Janet Pillai - friend & responsible citizen - over a beer, was not amused)

Yesterday, the 9th day of the 2nd moon, all the animals in the forest opened their mouths for the first time after their hibernation. At 6.45pm, precisely the moment when their mouths opened, I was at the Goddess of Mercy temple on Pitt Street with my aunt, where we made offerings of lard to the tiger-god. I had also spat on the negative forces that would come my way and vigorously stomped on a little paper figurine of a man to ward off any future evil intentions from people I will encounter.

The stage is now set. I've had a wonderful start to the renovation process. But now, knowing the path is clear and with the tiger-god protecting me, I stride ever more confidently into this exciting and very educational journey of many, many months.