Friday, November 4, 2011

Capping the 9th Pile - Monsoon Excitement!

unloading the pre-mixed concrete on to wheel-barrows

2nd November, 2011: The concrete delivery truck never arrives on time. The monsoon rains on the other hand, almost always do. So when the truck finally arrived at 4.15pm last Wednesday, the workers exploded into a frenzy, releasing the humid afternoon's accumulated anxieties and tensions as they raced against time to fill the pile-cap with wheel-barrow after wheel-barrow of concrete.

The pile was capped in 30 minutes, just in time before the first drops were felt. Hurrah!!

Quickly! Quickly! Racing to cap the piles before the rains arrived

Storm clouds gathering. Arrive it did. As expected.

Monday, October 31, 2011

Lightweight Bricks

An Autoclaved Aerated Conrete block or lightweight brick, is essentially concrete with lots of little air pockets. According to Wikipedia, AAC was invented in the mid-1920s by the Swedish architect and inventor Johan Axel Eriksson. But it only became a popular building material world-wide in the 1980's. To me, it looks like a rectangular block of hardened meringue.

The wall - notice the size of the normal brick sitting on top of the wall

The wall separating the house and the back-lane is being rebuilt using this material. The reason for using this "brick" over conventional clay bricks is the need to lighten the load on the site. Indeed, these blocks are light - scarily light. The wall swayed when I touched it while it was being built, but thankfully stiffened when the concrete columns were erected later, effectively bracing the ends of the wall.

AAC blocks will also be used for all the walls dividing the rooms. Because they have so much air in them, they are very effective thermal and sound insulators, perfect for hotel room walls.


Wednesday, October 26, 2011

Ground Beams

Laying of ground-beams are underway. As of today, the ground-beams for the kitchen/toilet area at the back of the house have been laid.

ground-beams for the toilets & kitchen area

Ground-beams function as connectors between pile-caps. (and pile-caps are concrete blocks that sit on top of the piles) In a site where the ground is soft, there is a high risk of uneven settlement amongst the pile-caps. So, what the ground-beams do is that they "tie" the caps together to stabilize the foundation and minimize uneven settling. The workers are currently laying the beams in the studio/gallery section
.

moulding for the ground-beam in the studio area, waiting to be filled with concrete

Look at how high the water-table level is - sitting just below the pile-caps. After a recent bout of monsoon rains, the water level rose up to about a foot and a half below floor level. You can gauge the water level from the ground-beam at the back section. It looked like this:-

after the rain

Tuesday, October 18, 2011

Bakau Rules the Day

the architect's vision

Originally, the 3-storey extension at the back of the house was to sit on a foundation of concrete piles. But we switched to using bakau piles after discovering there was only one piling contractor in all of Malaysia with equipment compact enough to enter the site. He was going to charge me over 3x the normal mobilisation cost, probably because he had a monopoly on the market. I wasn't about to spend the amount he wanted, which was almost a quarter of my budget. S
o, bakau piles it had to be.

bakau standing by

It turns out that bakau wood is an extremely suitable piling material for the soil conditions at Malay Street, and has been traditionally used in the area as a material for laying building foundations. As the area was reclaimed from what was originally a swamp, the water table is very high. This allowed the piles to be perpetually immersed in water - a pre-requisite condition for ensuring bakau - or mangrove - doesn't rot. Also, the 'soil', being composed of marine clay made it easy to drive the piles in using only a backhoe.

the backhoe, ready to go

I learned that bakau piles are called "friction piles" because the piles are suspended in the clay by friction between the pile and the surrounding clay - rather than resting on rock or a hard surface at the bottom. Its as if the clay were gripping the piles like a hand would.

bakau piles for one column, ready for capping

This would work out well. Except that the weight of the building had to be reduced. So, we scrapped the green roof and changed the concrete stairs at the back to one of steel.

pouring concrete to cap the pile

Monday, October 17, 2011

ReStarting - neutered and neurotic

Its been over 2 years since my last post. During this time I had been busy applying for planning and building permissions from the city council.

This was my first time ever having gone through such an extended bureaucratic process. And I was totally overwhelmed and floored by the reality of its own caricature. Its a long story, better told over bottles of wine. Suffice to say the process confirmed the long-held belief that the civil service is from another dimension where irrationality is a way of life, and any attempt to engage with them would suck you into a deep psychotic morass that is potentially inescapable. Inevitably, my experience reduced me to a ball of quivering jelly, incapable of anything except scream with popping blood-shot eyeballs "I WILL COMPLY!".

When the approval letter was finally issued in June, 2011, I didn't even dare to feel relief, fearing a second letter from another department to follow informing that I had left out something or other and therefore was not in compliance. Thankfully, it remained a nightmare.

Thursday, April 16, 2009

Penang design weekend

On the 5th of April, Lillian came to Penang for a day to look at no.105.

With her was Incognito Amigo – an engineer friend who has kindly offered to advise on structure related issues. They arrived in the morning at just the right time for breakfast. So, I took them for a leisurely Char Koay Teow in Pulau Tikus after which we made our way to no.105 where Teong Kooi and Joyce, teachers from my Free School days, joined us.

Teong Kooi, proud teacher that he is, offered to take responsibility for providing ambient music for 105, drawing from his vast collection of jazz records and cds. That morning he chatted excitedly, smoked, watched and listened as Joyce quietly read the newspapers.

Meanwhile, Incognito checked the beams, pulled the ceiling boards down nearly killing me, looked at some cracks and kicked the wall (and the bricks crumbled and fell out!), while Lillian took additional measurements and photographed the views from the building. Discussions centered around structural design and choice of materials. We also considered the relationships between the old and new parts of the house and the spatial transitions within the house.

2 sweaty hours later, we adjourned to Keng Kwee Street for cendol which was frantically delicious. This was followed by a much calmer experience at the E&O where we adjourned to for beer, coffee, and more discussion on the transition between the various spaces and elements in the house eg the air-well, pond, entry way and also the human traffic-flow.

Here at the E&O, Teong Kooi extolled the virtues of capitalist opportunism, without which, he said, he would most certainly be unable to enjoy the luxuries of such a hotel for the price of a cup of coffee, including taking a crap in style. We most certainly couldn’t disagree.

It had been an intense day of discussions, and for Lillian and Incognito, designing as well. Teong Kooi and Joyce suggested we rounded off the day with some grilled sea-food in Batu Maung. No one could top that suggestion. And so, despite driving into a freak storm and with Incognito and Teong Kooi ending up in Prai, we did eventually make it in time to catch the picture perfect sunset that sealed a very productive day.

KL Design week

This past month, I have met and discussed renovation plans with my architect and friend, Lillian Tay over 2 major sessions – one in KL and the other in Penang. This is office web-site http://www.veritas.com.my/

The 1st KL meeting was held in Lillian’s house on 22nd March, where 3 other friends and my sister, Heng Leng attended as well. It was a rowdy free-for-all that propelled itself late into the night on copious amounts of food, alcohol and cigarettes.
We talked about a range of issues: what the space will be used for; sustainability of the business; the cost of the renovation; what to retain, to restore or to demolish; being ‘green’; the possible structural solutions that can be used and what it means to be located in the heritage zone.

It was indeed a fabulous brain-storming session that Lillian would mine for design ideas which we looked at and discussed a few days later.

Mark Choo, resident accountant and risk manager who had been away checking on a chicken farm in Sitiawan, came along for the follow-up meeting on 25th March, where we “crunched some numbers” and gawked at Lillian’s design. She presented a simple and very elegant scheme for an 8 – 10 room budget hotel that included a multi-functional studio, a cafĂ© and maybe a small performance area.

The scheme opened up the house, allowing additional light and ventilation by reclaiming the pre-existing side air-well, and balancing small, compact rooms with lots of common access areas. While the front of the house will be restored, the back section after the air-well will be replaced with a freestanding, 3-storey concrete and steel intervention.

Excited as I was by her bold approach to the design process, I couldn’t help thinking, secretively, about some not-so-lofty things, like where I was going to keep my mop, how to get rid of the stink from the toilet bowl, where are the air-con compressors going to be stacked and stuff like that. But I wasn’t sure if I was “allowed” to, or whether the time was right to bring them up. So I kept quiet and thought I’d better wait a while and see what happens before asking these kinds of mundane questions.