105 Malay Street

Wednesday, February 8, 2012

Limping Along

›
22nd December, 2011 - steel bars for concrete columns of 1st floor up and ready Just when I thought things were smoothly moving along, the ...

Hoping It Was Priscilla

›
20th December, 2011 sitting pretty in pink Lip-synching stiletto-ed dancing-queens were - disappointingly - not what I encountered behind th...
Monday, December 5, 2011

Inching Up

›
A couple of things I have learnt about what happens to a construction project at the end of the year is that 1) the monsoon rains limit the ...
Friday, November 4, 2011

Capping the 9th Pile - Monsoon Excitement!

›
unloading the pre-mixed concrete on to wheel-barrows 2nd November, 2011: The concrete delivery truck never arrives on time. The monsoon ...
Monday, October 31, 2011

Lightweight Bricks

›
An Autoclaved Aerated Conrete block or lightweight brick, is essentially concrete with lots of little air pockets. According to Wikipedia,...
1 comment:
Wednesday, October 26, 2011

Ground Beams

›
Laying of ground-beams are underway. As of today, the ground-beams for the kitchen/toilet area at the back of the house have been laid. gr...
Tuesday, October 18, 2011

Bakau Rules the Day

›
the architect's vision Originally, the 3-storey extension at the back of the house was to sit on a foundation of concrete piles. But w...
›